House construction and engineering in Kathmandu
Bhargo Builders and Trades works from offices in Pokhara and Kathmandu, and our Engineers travel to sites across the country. For a plot in Kathmandu we start the same way as everywhere: a free site visit by a civil Engineer, a frank assessment of what the land will carry, and a written brief agreed before any drawing is started. From there we can take your project through drawings, structural design to the Nepal Building Code, the municipal approval file and construction, or provide any one of those stages on its own.
Building in Kathmandu, Kathmandu
- Free first site visit by a civil Engineer, usually within the same week
- Structural design to the Nepal Building Code, with reinforcement inspected before every pour
- Municipal approval file prepared and followed through by us
- Design only, design and build, or build only from your own drawings
What we do in Kathmandu
- Consultation. A free site visit by a civil Engineer, a frank assessment of the plot and a written brief.
- Planning. Working drawings, the municipal approval file and an itemised estimate.
- Structural analysis. Frames and foundations designed to the Nepal Building Code, with bar bending schedules.
- 3D modelling and rendering. Still renders and a walkthrough film, so you can decide before anything is built.
- Interior design. Finish schedules, joinery and lighting planned on the same drawings as the shell.
- Construction. A named Engineer and supervisor on site, a weekly photo report and a written snag list at handover.
See completed homes, hotels and commercial buildings on the projects section of our main page.
Questions about building in Kathmandu
Do you work in Kathmandu if your head office is in Pokhara?
Yes. Bhargo works from offices in Pokhara and Kathmandu, and our Engineers travel to sites anywhere in Nepal. Message Bipin on WhatsApp with the location and we will confirm a day for the visit.
Can you take on a renovation or an extra floor in Kathmandu?
Yes. We take on renovations and single-floor additions as well as complete structures, and we can strengthen an existing building to the current code.
Will the cost change once work starts?
You receive an itemised estimate by material and quantity. Any item tied to a market rate is identified at the outset, so you can see what may change and what will not.